Eine dreiköpfige Familie beim Wandern zum Brunnsteiner See in der Ferienregion Pyhrn-Priel.
Upper Austria

Ship's passages in Upper Austria

(96) results
List
Map
:
Infrastruktur
Neustift im Mühlkreis

The boat harbour is situated 40 km from Passau between Engelhartszell and Niederranna. It idyllically lies at the Danube in front of a bourgeois restaurant and the Danube cycling path. From here, you can start from the Danube cycling path and have a little detour to...

Infrastruktur
Feldkirchen an der Donau

Construction: landing stage (lengthwise) River-km/Bank: 2159,4 / left banks Berths: 10 Slip facility: yes Infrastructure: nearby gas station Sanitary equipment: yes Catering: Restaurant and shops in Landshaag and Aschach

Infrastruktur
Linz

Construction: landing stage River-km/Bank: 2129,8 / right banks Berths: 6 Slip facility: yes Infrastructure: electricity, water Sanitary equipment: yes Catering: Other: 3,5 km to the city centre (bus connection), Boote Feichtner in 100m

Infrastruktur
Linz

Construction: landing stage River-km/Bank: 2134,6  / right banks Berths: 4 Slip facility: yes Infrastructure: electricity, water Sanitary equipment: yes Catering: nearby Other:  2,5km to central Linz

Infrastruktur
Linz

Construction: landing stage River-km/Bank: 2132 / right Berths: boats up to 30m, 2 rows possible Slip facility: available at the Winterhafen Infrastructure: electricity, water Sanitary equipment: no Catering: restaurant in hotel Steigenberger (50m), shops (1km)...

Infrastruktur
Mauthausen

Construction: landing stage River-km/Bank: 2107 / left Berths: 2 Slip facility: - Infrastructure: - Sanitary equipment: - Catering: in the central village (300m), the mall “Donaupark” (200m) Other: currently not available due to building project flood dam

Infrastruktur
Obermühl

Construction: landing stage River-km/Bank: 2178 / left Berths: 8 Slip facility: yes Infrastructure: electricity Sanitary equipment: - Catering: inn, mobile bakery

Infrastruktur
Esternberg

Construction: landing stage (30m) River-km/Bank: 2213 / right Berths: - Slip facility: - Infrastructure: - Sanitary equipment: - Catering: - Other: 6km to Esternberg

Infrastruktur
Haibach ob der Donau

Construction: harbour Schlögen River-km/Bank:  2187 / right Berths: 200 seasonal and 40 guest moorings Slip facility: yes Infrastructure: electricity, water, refuelling station, repair and service centre Sanitary equipment: yes Catering: inside the marina...

Infrastruktur
Sankt Martin im Mühlkreis

Construction: landing stage River-km/Bank:  21868,03 / left Berths: 50 Slip facility: yes Infrastructure: electricity, water Sanitary equipment: public toilets at the nearby restaurant (80m) Catering: restaurant, in the village Other: harbour operating times:...

96 Points of Interest (zeige 21 - 30)
Seite1 2 3 4 5 6 7 8 9 10
Contents are being loaded ...